20250227_163714 (1)

TAMS Solar PV Grant - Up to 60% Support for Irish Farms

Blackwell Energy help farmers across Ireland access the TAMS Solar PV Grant –  or to find out what other grants you are entitled too such as the SEAI non domestic grant. we help manage grant application as much as we can, system design, installation and final grant claim. 

The Targeted Agricultural Modernisation Scheme (TAMS 3) is designed to support farmers in adopting renewable energy solutions that reduce energy costs and lower their carbon footprint. The scheme is jointly funded by the Irish Government and the European Union under the Rural Development Plan 2014–2022 and the CAP Strategic Plan 2023–2027. Farmers can avail of grant aid of up to 60%, with a maximum investment ceiling of €90,000 per holding. The minimum eligible investment under the scheme is €2,000.

Why Blackwell Energy for your TAMS solar PV grant?

Blackwell energy is an experienced solar installer working with farmers across Ireland to deliver cost saving renewable energy solution. We help farmers access the TAMS solar PV grant through a clear start to finish process that covers eligibility checks, system design, application, installation and final grant claim. As an SEAI certified installer operating under full Safe Electric compliance, we ensure every farm solar PV system is Safe, efficient and built to maximise long term performance. 

Why choose TAMS solar PV grant

High grant rates

Up to 60% grant support for eligible on-farm solar projects.

Reduce energy costs

Install panels sized for on-farm consumption to cut electricity bills.

End-to-end- service

We handle applications, DAFM compliance, design, installation and grant claim.

How the TAMS application works

Quick call or complete a form, to assess likely grant and eligibility.

We provide a free on site technical assessment of your farm. 

We will review your annual consumption and assess your most suitable roof surfaces alongside your MIC

We prepare a fully bespoke solar PV system design, engineered precisely for your site. The comprehensive proposal features verified energy yield predictions and a transparent lifetime savings breakdown to clearly demonstrate the financial viability of your investment.

We will work in conjunction with your grant advisor, to help prepare your TAMS application with any required supporting documents.

Applications are made through the Department of Agriculture’s AgFood portal and can only be made during open tranche periods. Applications are assessed based on criteria such as age, farm size, and location in Areas of Natural Constraint.

For systems requiring a medium-scale connection (e.g., NC7 or NC8, we take responsibility for the entire ESB Networks application, providing full assistance and submission free of cost.

Manual applications are not accepted.

Once approved we schedule and complete installation safely and efficiently 

We finalise documents and liaise with DAFM until grant is paid. 

TAMS solar PV grant eligibility?

  • Registered farmer: You must be registered with DAFM and hold a herd number or valid department identifier. 
  • Land eligibility: Minimum of 5 hectares under BPS/BISS (or 20 production unit for intensive farms).
  • On-farm use: Solar PV must supply farm electricity need (Farm building or dwelling). Export is secondary. 
  • Project value: Minimum eligibility spend is approx. €2,000 (varies by tranche).
  • Approved contractors: System must meet DAFM standards and be installed by approved providers. 
  • Farm Safety Training: Applicants must complete a Farm Safety Code of Practice or FETAC Level 6 Advanced Certificate in Agriculture within the last 5 years.

Know more about the DAFM TAMS Solar PV Grant 

Requirement Details
Registration Must be a registered farmer (herd number or Department ID)
Land eligibility ≥ 5 ha declared under BPS/BISS or 20+ production units; intensive enterprises allowed
Electricity use Must be for on-farm use only (includes dwelling); no export to grid for grant purposes
Minimum spend / Maximum output Projects must exceed ~€2,000 in investment. Output of the new ssystem cannot exceed 90% of the previous years consumption
Installer requirements Approved installer; site survey mandatory; technical standards must be met
Reference documentation Available via DAFM’s Solar Capital Investment Scheme page on gov.ie

FAQs

Many farmers can claim up to 60% funding support for solar panels and related equipment. The exact grant depends on your farm type and the TAMS tranche.

We will calculate your exact eligible grant amount during your free survey. 

Applications are made through the Department of Agriculture’s AgFood portal and can only be made during open tranche periods. Applications are assessed based on criteria such as age, farm size, and location in Areas of Natural Constraint.

Manual applications are not accepted.

Don’t worry, Blackwell Energy, are here to guide you through the online application process, ensuring all required documents are submitted correctly.

Required Documents:

    • On-Farm Solar PV Survey.
    • Farmyard layout plan and site location map.
    • Planning permission or exemption certificate (if applicable).
    • Ownership or lease documents.
    • Supporting electricity bills.

Most roof-mounted solar PV systems don’t require planning. Ground mount systems or large arrays sometimes do. 

We will guide you through every step and help handle the paperwork if planning is required. 

Yes, but batteries are funded at a maximum of 50% of the solar panel output. TAMS Grant conditions state that; 100% of electricity generated must be consumed on the farm holding.

We will design a system that matches your farm’s energy use and confirm what’s covered under TAMS. 

From initial check to installation, the process usually takes 4-12 weeks after approval. Timing depends on Tranche openings and Department processing. 

Blackwell Energy will keep you updated and ensure your grant is processed as fast as possible. 

  • Investments must comply with Department specifications.
  • Work cannot commence before approval is issued.
  • All works must be completed within 12 months of approval (extensions allowed under specific conditions).
DCIM101MEDIADJI_0298.JPG
sustainable-energy-authority-of-ireland-seai-vector-logo

SEAI Approved Installer

safe-electric-logo-3-scaled-1

Registered Electrical

Certified Installer